The brief was to maximise the accommodation on the site within a tight budget. This was further complicated by the presence of previous unfilled cellars which necessitated using piled foundations.
The building has a steel portal frame with a natural slate roof and a mixture of natural stone and brick walls.
The basic structure was included during construction for a first floor.